Underground Salt Mine Shaft Maintenance Platform

A 35'0" tall aluminum work stage, consisting of four decks, was designed for guide changing, scaling, and concrete lining of a salt mine.

The decks are hinge connected to the frame and can be manually raised during ascent or descent while performing shaft maintenance. The mid decks can be removed during guide changing operations.The bottom deck is designed to accomodate heavy equipment.

There are two monorails on either side of the work stage for guide changing operation.

Please click on the thumbnails below to see pictures of the work stage.